Project Summary
Bennco Engineering was engaged by a major resource client's project engineering division to construct and install a fully integrated Water Treatment Plant located at a Greenfield site 100+ kms from Tom Price.
All logistic requirements were managed exclusively by the regional team with the project delivered to a high-quality specification, underpinned by stringent workplace health and safety standards ad within commercial terms of cost and time.
Cost
< $100k
Year Completed
2017
Project Scope
Bennco Engineering was engaged by their tier 1 mining client to install a newly designed Water Filtration Plant to purify water from mine pits to be sent to Tom Price for potable uses, the works included the fabrication and installation of large bore piping and valves, platforms and vessels and large span steel structure over the facility to protect from the harsh Pilbara weather conditions
Solution
Due to the remoteness of the project and the harsh weather conditions Bennco Engineering Pilbara team had to work closely with all stakeholders to ensure all works were carried out in a safely and timely manner as not to affect critical water supplies to the nearby town, and also during high risk crane lifts of wide span steel portal structures.
The project was completed on time, under budget and most importantly without incident.