Bennco Engineering has successfully manufactured and delivered multiple plant upgrades from our 9000m2 SMP Fabrication Workshop and Laydown facility, LIA, Tom Price, Pilbara. Showcasing our detailed capabilities and intimate local knowledge.
We have proven expertise in the delivery of safe, high quality, cost-effective engineered solutions in the following:
- Design and fabrication process pilot plants
- Reverse engineering of components for better plant efficiency
- Structural Integrity works
- Conveyor optimisation projects
- Dust system upgrades
- Fabrication and installation of new conveyor GTU winches
- Fabrication and installation of new CD1 ducting
- Replacement and surveying of new stacker rails
- Reverse Engineering and Refurbishment of a 38-year-old lump chute (hood)
- Portable and drop in access platforms
- Equipment removal jigs
- Design and fabrication process pilot plants.
- Reverse engineering of components for better plant efficiency.
- Structural Integrity works.
- Conveyor optimisation projects.
- Dust system upgrades.
- Fabrication and installation of new conveyor GTU winches.
- Fabrication and installation of new CD1 ducting.
- Replacement and surveying of new stacker rails.
- Chute redesigns.
- Portable and drop in access platforms.
- Equipment removal jigs.